Line Survey

  • Tower Schedule.
  • Abstract of Tower.
  • Line schedule.
  • Tree schedule.
  • Abstract of lines.
  • Soil resistivity report.
  • Burgie details.
  • Route map.
  • Route profile.

1.Procurement

  • Poles.
  • Tower Materials.
  • Conductors.
  • Other Supporting Accessories.

1.Erection

  • 11kV Pole.
  • 33kV Pole.
  • 66kV Tower.
  • Conductor laying.

1.Documentation